Bayssour 475 Villa
Location: Bayssour, Mount Lebanon Project Description: Luxurious private villa, with a total built up area of 560 sqm. Scope Of Work: Civil work, all mechanical, electrical, and finishing works.
Location: Bayssour, Mount Lebanon Project Description: Luxurious private villa, with a total built up area of 560 sqm. Scope Of Work: Civil work, all mechanical, electrical, and finishing works.
Location: Bayssour, Mount Lebanon Project Description: Private residential villa, stretching over an area of 1000 sqm, with a built up area of 750 sqm. Scope of work: finishing works and landscaping
Location: Beirut, Verdun Description: demolition, civil, electrical, mechanical and finishing works, as per requested design Designer: Mrs. Iman Abou Ayash
Location: Saadiyat Area Owner: Arabian Civil Works Role: Sub-contractor of ACEC, as Eng. Rabah Aridi is a co-founder of the latter, Awarded the trenching, installation and pressure test of the sewage system along the 24km Saadiyat road
Client: Ministry of Telecommunication – Republic of Lebanon Consultant: Khatib and Alami – Consolidated Engineering Co.S.A.L Main contractor: Consolidated Engineering & Trading S.A.L Role: Sub-contractor with Roads and Buildings Description: Fiber Optic infrastructure (62 KM) for Mount Lebanon and Akkar
Owner: Mrs. Rania Ramadan Location: Aytat Scope of work: Design and permit works Description: a built-up area of 1500 sqm and a surface area of 1000 sqm
Location: Beirut, Ramel El Bayda Area: 450 sqm Scope of work: Interior design, mechanical and electrical works, and finishing works Duration: 1 year Date: 2012-2013
Location: Beirut Tallet El khayyat Area: 300 sqm Scope of work: Demolition and mechanical, electrical, and finishing works, furnitures.
Location: Hazmieh Owner: Boustany United Motor Company Role: Sub-contractor of ACEC – as Eng. Rabah Aridi is a co-founder of the latter; internal and external concrete works
Location: Saida Owner: SGBL Consultant: Raed Abi Lamaa Role: Sub-contractor of ACEC, as Eng. Rabah Aridi is a co-founder of the latter, Awarded the demolition of old branch and complete execution of all mechanical, electrical and finishing works
Owner: MR Group Duration: 2 months for paint jobs/ 6 to 8 months for spa Location: Prestigious Fakra Area Scope of Work: Sub-contractor of ACEC, as Eng. Rabah Aridi is a co-founder of the latter, Awarded the paints contract for all of the 60 private villas.
Location: Beirut, John Kennedy Str Role: Sub-contractor of ACEC, as Eng. Rabah Aridi is a co-founder of the latter, Demolition of old shop and complete execution of all mechanical, electrical and finishing works
Location: Beqaa Sub-contractor of: STFA (SEZAI TURKES FEYZI AKKAYA INSAAT A.S.) Texas Varrier (Steel and Concrete Work) Description: Civil + concrete works Water Pipelines Description: Excavation, Installation of pipes, back-filling, and pumping test
Location: Tallet El Khayyat Scope of work: Exterior Maintenance and renovation Date: 2009
Location: Beirut-Tallet Elkhayyat Scope of work: Demolition and turn-key Design and Supervision by: Dada Association Area: 500 sqm Duration: 1 year Date: 2010
Location: Aaraya Scope of work: Excavation and concrete work Date: 2009
Client: Council for Development and Reconstruction – Republic of Lebanon Consultant: Dar Al Handasa – Taleb Main contractor: Nesma -CET JV Role: Sub-contractor with Roads and Buildings Description: Wastewater collection and treatment – Treatment plant
Location: Kazakhstan – Center of Almaty Area: 450 sqm Scope of work: Demolition, interior design, mechanical works, electrical works, and finishing works. Date: 2006-2007
Location: Almaty, Kazakhstan Owner: United Universal Company Consultant and Designer: Spectrum Scope of work: Management and coordination Date: 2005-2008
Owner: Pharm Industry Corporation Scope of work: Management and Coordination Consultant: Spectrum Location: Kazakhstan Date: 2005-2008
Owner: Universal United Scope of work: Management and Supervision Date: 2005-2008
Scope of work: Management and supervision of construction Date: 2005-2008
Scope of work: Management and supervision of construction and installation of equipment Date: 2005-2008
Project: The Second Telecommunications for Outside Plant – OSP2 Description: Telephonic infrastructure (42 KM) for the Mount of Lebanon (Sofar exchange) Client: Ministry of Telecommunication – Republic of Lebanon Consultant: Khatib and Alami – Consolidated Engineering Co.S.A.L Main contractor: Consolidated Engineering & Trading S.A.L Scope of work: excavation/trenching, installation of pipes, backfilling, and compaction and[…]