Saadiyat – Ain Al Hour
Location: Saadiyat Area Owner: Arabian Civil Works Role: Sub-contractor of ACEC, as Eng. Rabah Aridi is a co-founder of the latter, Awarded the trenching, installation and pressure test of the sewage system along the 24km Saadiyat road