Les Dunes de Fakra
Owner: MR Group Duration: 2 months for paint jobs/ 6 to 8 months for spa Location: Prestigious Fakra Area Scope of Work: Sub-contractor of ACEC, as Eng. Rabah Aridi is a co-founder of the latter, Awarded the paints contract for all of the 60 private villas.